The ISO11452-4 standard describes the testing and measurement techniques for Bulk current injection (BCI).

Test method in short[edit]

Increase the forward power applied to the current injection probe and measure the injected current (Iref) until either

  • The measured current reaches the specified test level, or
  • The forward power reaches the power limit PCW limit.

Supported by RadiMation®?[edit]