(Created page with "= How to perform HV/LV Coupling measurements in {{RadiMation}} according to CISPR25 = In this application note we shall explain how {{RadiMation}} can be configured and used...")
 
 
(25 intermediate revisions by 2 users not shown)
Line 1: Line 1:
= How to perform HV/LV Coupling measurements in {{RadiMation}} according to CISPR25  =
__NOTOC__
In this application note we shall explain how {{RadiMation}} can be configured and used to perform HV/LV Coupling measurements according to Annex I of CISPR25.
= How to perform HV/LV Coupling measurements in {{RadiMation}} according to CISPR 25 =
This {{RadiMation}} application note explains how the high-voltage (HV) to low-voltage (LV) Coupling attenuation can be measured with {{RadiMation}}. This HV-LV coupling attenuation is needed for several automotive standards, for example the [[CISPR 25]]:2016-10


== Performing the voltage calibration according to CISPR25 ==
== HV-LV coupling attenuation ==
The HV-LV coupling attenuation measurement as it is described in Annex I.5.2 of the [[CISPR 25]], is designated for components that are connected to the high voltage (above 60 V) system and the low voltage system of a motor vehicle, and has the purpose to determine the coupling between the two voltage systems through the component.


This section shall describe the devices and configuration needed for the voltage calibration according to Annex I.5.2 of CISPR25
The principle of this measurement is that a component (the EUT) is connected on one side to the LV network and on the other side to the HV network. Then a defined disturbance signal is provided on the high voltage side, and an emission measurement is performed on the low voltage side of the EUT to determine how much of the injected signal is leaking to low voltage system.  


'''Devices''': </BR>
== Performing the voltage calibration according to CISPR 25 ==
* HV/LV AN</BR>
For the voltage calibration according to Annex I.5.2 of [[CISPR 25]], the following devices and configuration are needed:
* EUT</BR>
* Signal generator</BR>
* Analyzer as volt meter</BR>


'''Cables corrections''' (note. Cable corrections are optional)</BR>
'''Devices''':
* Sig gen  EUT </BR>
* HV/LV AN
* EUT  pre-amp(optional)</BR>
* EUT
* pre-amp(optional)  analyzer</BR>
* Signal generator
* Spectrum analyser


'''Configurations''': </BR>
'''Cables corrections''': (note: Cable corrections are optional)
* CI module</BR>
* Signal generator -> EUT
* Voltage closed loop method --> using analyser as power meter as volt meter</BR>
* EUT -> pre-amp
* Voltage calibration file</BR>
* pre-amp -> analyser


=== Exporting a voltage calibration file ===
'''Configurations''':
* CI module
* Voltage closed loop method -> using analyser as volt measuring device


To perform the required voltage calibration the 'Voltage closed loop method' is used. This method required to generate the same voltage level, while the power of the measurement locations is measured. This test can be configured using a Multiband Immunity test.
=== Voltage closed loop measurement using a spectrum analyser ===
{{RadiMation}} is able to measure the voltage during immunity tests by using a spectrum analyser.
When selecting the testlevel/limit/input for the voltage, it is possible to select the measuring device. The selected {{ScreenElement|Device}} can be changed to {{ScreenElement|Spectrum Analyzer}}.
 
[[File:ConfigTestLevelVoltage.png]]
 
=== Exporting the voltage calibration file ===
 
To perform the required voltage calibration the {{ScreenElement|Voltage closed loop method}} is used. This method is required to generate the same voltage level, while the power of the measurement locations is measured. This test can be configured using a Multiband Immunity test.


* Create an EUT file that is used to store the calibration measurement results
* Create an EUT file that is used to store the calibration measurement results
Line 30: Line 40:
* Start the configured test, and wait until the measurement is finished.
* Start the configured test, and wait until the measurement is finished.
* When the test is finished, the data of the measured voltage graphline can be exported to a Calibration file (CAL-File)
* When the test is finished, the data of the measured voltage graphline can be exported to a Calibration file (CAL-File)
* Click the 'Graphs' button above the graph, and select the 'Export...' option
* Click the {{ScreenElement|Graphs}} button above the graph, and select the {{ScreenElement|Export...}} option
* Select the voltage graphline that should be exported to a Calibration file, then click the 'Next' button  
* Select the voltage graphline that should be exported to a Calibration file, then click the {{ScreenElement|Next}} button  
* Select 'CAL-file' as the type of the file to which the graphline should be exported, then click the 'Export' button.
* Select {{ScreenElement|CAL-file}} as the type of the file to which the graphline should be exported, then click the {{ScreenElement|Export}} button.
* A 'Save Calibration as' dialog will be shown to determine the location and name where the final calibration file should be stored.
* A {{ScreenElement|Save Calibration as}} dialog will be shown to determine the location and name where the final calibration file should be stored.
* The exported Calibration file is the result of the 'constant voltage method' for that measurement location. This calibration file can be used during substitution tests to generate a required voltage.
* The exported Calibration file is the result of the 'constant voltage method' for that measurement location. This calibration file can be used during substitution tests to generate a required voltage.


== Performing the voltage emission test according to CISPR 25 ==
For the voltage measurement according to Annex I.5.2.3 of CISPR 25, the following devices and configurations are needed:
'''Devices''':
* HV/LV AN
* EUT
* Signal generator
* Spectrum analyser
'''Cables corrections''': (note: cable corrections are optional)
* Signal generator -> EUT
* EUT -> pre-amp
* Pre-amp -> analyser
'''Configurations''':
* CI module
* Voltage calibration file
* Test level voltage substitution -> using the voltage calibration file
* Test level voltage measurement input -> using analyser as volt measuring device
* Applicable limit lines
=== Regulating to the calibrated voltage ===
{{RadiMation}} is able to regulate to the voltages determined during the performed voltage calibration.
[[File:ConfigureTestLevelVoltageSubstitution.png]]


== Performing the voltage emission test according to CISPR25 ==
=== Measure the voltage using a spectrum analyzer ===
This section shall describe the devices and configuration needed for the voltage measurement according to Annex I.5.2.3 of CISPR25.


'''Devices''':</BR>
{{RadiMation}} is able to measure the voltage during immunity tests by using a spectrum analyser.
* HV/LV AN</BR>
When selecting the testlevel/limit/input for the voltage, it is possible to select the measuring device. This selection can be switched to {{ScreenElement|Spectrum Analyzer}}.
* EUT</BR>
* Signal generator</BR>
* Analyzer as volt meter</BR>


'''Cables corrections'''  note. cables are optional</BR>
[[File:ConfigureTestLevelVoltage.png]]
* Sig gen -> EUT</BR>
* EUT  pre-amp(optional)</BR>
* Pre-amp(optional)  analyzer</BR>


'''Configurations''':</BR>
== Performing the current emission test according to CISPR 25 ==
* CI module</BR>
For the current measurement according to Annex I.5.2.4 of CISPR 25, the following devices and configuration are needed:
* Voltage calibration file</BR>
 
* Test level voltage substitution </BR>
'''Devices''':
* Test level voltage measurement input -> using analyzer volt meter
* HV/LV AN
* EUT
* Signal generator
* Spectrum Analyser -> Used as the sensor power meter in test-site
* Current sensor(with correction file containing the transfer factor in Ohm)
 
'''Cables corrections''': (note: Cable corrections are optional)
* Signal generator -> EUT
* EUT -> pre-amp
* Pre-amp -> analyser
 
'''Configurations''':
* CI module
* Voltage calibration file
* Test level voltage substitution -> using the voltage calibration file
* Test level input current sensor
* Applicable limit lines
* Applicable limit lines


== Performing the current emission test according to CISPR25 ==
=== Regulating to the calibrated voltage ===
This section  shall describe the devices and configuration needed for the current measurement according to Annex I.5.2.4 of CISPR25.
 
{{RadiMation}} is able to regulate to the voltages determined during the performed voltage calibration.
 
[[File:ConfigureTestLevelVoltageSubstitution.png]]


'''Devices''':</BR>
=== Measure the current using a spectrum analyser ===
* HV/LV AN</BR>
* EUT</BR>
* Signal generator</BR>
* Analyzer as current sensor represented by: analyzer as sensor power meter + current sensor(with transfer factor in Ohm)</BR>


'''Cables corrections'''  (note. Cable corrections are optional)</BR>
{{RadiMation}} is able to measure the current during immunity tests by using a spectrum analyser as a sensor power meter in combination with a current sensor.
* Sig gen -> EUT</BR>
* EUT  pre-amp(optional)</BR>
* Pre-amp(optional)  analyzer</BR>


[[File:ConfigureTestLevelCurrent.png]]


'''Configurations''':</BR>
=== Use a specific detector circuit during current measurements when using an analyser ===
* CI module</BR>
When a spectrum analyser is used as the power meter, it is possible to configure the detector that should be used by the analyser.
* Test level voltage substitution </BR>
* Voltage calibration file</BR>
* Test level measure current input -> analyzer as sensor power meter + current sensor (correction file with resistance in Ohm)</BR>
* Applicable limit lines</BR>


=== Use a specific detector circuit for the analyzer as power meter ===
This can be configured in the advanced options of the analyser used as power meter
When using an analyzer as power meter, it shall now be possible to configure the
detector circuit used by the analyzer.</BR>
This can be configured in the advanced options of the analyzer used as power meter


[[File:ConfigureAnalyzerAsPowerMeter.png]]
[[File:ConfigureAnalyzerAsPowerMeter.png]]


== Performing the radiated emission test according to CISPR 25 ==
For the electrical field strength measurement according to Annex I.5.2.5 of CISPR 25, the following devices and configuration are needed:


== Performing the radiated emission test according to CISPR25 ==
'''Devices''':
* HV/LV AN
* EUT
* Signal generator
* Spectrum analyser -> Used as the measuring device for the electrical field
* Calibration antenna with antenna factor correction attached


This section  shall describe the devices and configuration needed for the fieldstrength measurement according to Annex I.5.2.5 of CISPR25..
'''Cables corrections''': (note: Cable corrections are optional)
* Signal generator -> EUT
* EUT -> pre-amp
* Pre-amp -> analyser


'''Devices''':</BR>
'''Configurations''':
* HV/LV AN</BR>
* CI module
* EUT</BR>
* Voltage calibration file
* Signal generator</BR>
* Test level voltage substitution -> using the voltage calibration file
* Analyzer as field sensor represented by: spectrum analyser + calibration antenna</BR>
* Test level electrical field input -> using spectrum analyser as field measuring device
* Calibration antenna with correction file containing the antenna factor)
* Applicable limit lines


'''Cables corrections'''  (note. Cable corrections are optional)</BR>
=== Regulating to the calibrated voltage ===
* Sig gen -> EUT</BR>
{{RadiMation}} is able to regulate to the voltages determined during the performed voltage calibration.
* EUT  pre-amp(optional)</BR>
* Pre-amp(optional)  analyzer</BR>


'''Configurations''':</BR>
[[File:ConfigureTestLevelVoltageSubstitution.png]]
* CI module</BR>
* Voltage calibration file</BR>
* Test level voltage substitution </BR>
* Test level electrical field input using spectrum analyser + kalibration antenna (correction file with antenna factor)</BR>
* Applicable limit lines</BR>


=== Measure the electrical field using a spectrum analyzer ===
=== Measure the electrical field using a spectrum analyser ===


{{RadiMation}} is able to measure the electrical field during immunity tests by using a spectrum analyzer + antenna combination.
{{RadiMation}} is able to measure the electrical field during immunity tests by using a spectrum analyser + antenna combination.


When selecting the testlevel/limit/input for electrical field, it shall now we possible to select the measuring device. This selection can be switched between “Field Probe” and “Spectrum Analyzer”.
When selecting the testlevel/limit/input for electrical field, it shall now we possible to select the measuring device. This selection can be switched between {{ScreenElement|Field Probe}} and {{ScreenElement|Spectrum Analyser}}.


When selecting the “Spectrum Analyzer” as measurement device, other controls will be shown at the bottom of the configuration screen. These controls make it possible to change the following settings which are used by the analyzer to measure the electrical field.
When selecting the {{ScreenElement|Spectrum Analyser}} as measurement device, other controls will be shown at the bottom of the configuration screen. These controls make it possible to change the following settings which are used by the analyser to measure the electrical field.


* '''RBW'''
* {{ScreenElement|RBW}}
* '''Attenuation'''
* {{ScreenElement|Attenuation}}
* '''Preamplifier'''
* {{ScreenElement|Preamplifier}}
* '''Measure Time'''
* {{ScreenElement|Measure Time}}
* '''Detector''' (Peak, Average, Quasi-peak, RMS)
* {{ScreenElement|Detector}} (Peak, Average, Quasi-peak, RMS)


[[File:ConfigureTestLevelEField.png]]
[[File:ConfigureTestLevelEField.png]]


When the spectrum analyzer is used as the measureing device, an antenna must also be active in the test site. This antenna is used to attach the .COR file containing the antenna factor which is used to convert the measured voltage(V) returned from the analyzer to a electrical field (V/m)
When the spectrum analyser is used as the measuring device, an antenna must also be active in the test site. This antenna is used to attach the .COR file containing the antenna factor which is used to convert the measured voltage(V) returned from the analyser to a electrical field (V/m)


This method of measuring the electrical field uses the antenna factor which is attached to the cailibration antenna, because during inmmunity testing another antenna can already be used to generate the field.
This method of measuring the electrical field uses the antenna factor which is attached to the calibration antenna found in the test-site, because during immunity testing another antenna can already be used to generate the field.


'''Note'''. When the same antenna is configured for the antenna and calibration antenna slot found in the test-site, the antenna factor found in the .COR shall be merged with it self, when this happens the from voltage converted measured field shall be wrong. So make sure to create separate drivers for a normal antenna and calibration antenna, even if they in fact are the same antenna.
{{Note|When the same antenna is configured for the antenna and calibration antenna slot found in the test-site, the antenna factor found in the .COR shall be merged with it self, when this happens the from voltage converted measured field shall be wrong. So make sure to create separate drivers for a normal antenna and calibration antenna, even if they in fact are the same antenna.}}


= Configuring limit lines for HV/LV coupling measurements =
= Configuring limit lines for HV/LV coupling measurements =
Line 136: Line 175:
== Immunity limit lines ==
== Immunity limit lines ==


{{RadiMation}} is now able to calculate “peaks” according to set limit lines in the immunity testing modules.
{{RadiMation}} is now able to calculate {{ScreenElement|peaks}} according to set limit lines in the immunity testing modules.


These “peaks” indicate the channel name of the input on which the measured value has exceeded the limit line for a certain frequency, as well as the related measurement setting applicable to the moment the peak has been measured.
These {{ScreenElement|peaks}} indicate the channel name of the input on which the measured value has exceeded the limit line for a certain frequency, as well as the related measurement setting applicable to the moment the peak has been measured.


Limit lines can be added to an immunity test by clicking the limit lines button on the right side of the TSF file.  This will open a window in which limit lines can be configured for addition or removal.
Limit lines can be added to an immunity test by clicking the limit lines button on the right side of the TSF file.  This will open a window in which limit lines can be configured for addition or removal.


Peaks are only calculated for testlevels defined as inputs in the TSF- file. All software automaticly generated graphlines, as well as test levels, limits and other type of fixed value data are not taken in consideration for the peak calculation.
Peaks are only calculated for testlevels defined as inputs in the TSF- file. All software automatically generated graphlines, as well as test levels, limits and other type of fixed value data are not taken in consideration for the peak calculation.


[[File:ConfigureLimitLines.png]]
[[File:ConfigureLimitLines.png]]


== The peak table for immunity test modules ==
== Changing limit lines after test ==
 
Limit lines can also be changed after a test has finished. This can be done by selecting the limit line control on the right side of the view shown during/after testing.
 
When a limit line is changed all peaks are recalculated for the new limit line. This also implies that when all limit line are removed, all peaks shall be deleted.


In the view shown while the test is running, it is possible to select a peak-tab next to the events and notes tabs. This peaks tab will show all frequency’s, related settings and the channel name of the inputs for which these frequency and settings are applicable.  
{{Note|Since limit lines can be changed after tests, it is also possible to add limit lines to already performed test which have been created in older {{RadiMation}} releases.}}


The peak table is customizable in regards to which columns are shown.
[[File:ConfigureLimitLinesAfterTest.png]]


[[File:ImmunityPeakTable.png]]
== The peak table for immunity test modules ==


== Changing limit lines after test ==
In the view shown while the test is running, it is possible to select the {{ScreenElement|Peaks}} tab next to the {{ScreenElement|Events}} and {{ScreenElement|Note}} tabs. This {{ScreenElement|Peaks}} tab will show all frequencies, related settings and the channel name of the inputs for which these frequency and settings are applicable.


Limit lines can also be changed after a test has finished. This can be done by selecting the limit line control on the right side of the view shown during/after testing.
The peak table is customisable in regards to which columns are shown.


When a limit line is changed all peaks are recalculated for the new limit line.
[[File:ImmunityPeakTable.png]]
This also implies that when all limit line are removed, all peaks shall be deleted.


Note. Since limit lines can be changed after tests, it is also possible to add limit lines to already performed test which have been created in older {{RadiMation}} releases.
== Conclusion ==
The {{RadiMation}} multiband immunity test can be used to very accurately measure the leaking of the injected signal form the HV port to the LV port of components that are used in motor vehicles.


[[File:ConfigureLimitLinesAfterTest.png]]
Some standards describe that the HV-LV coupling attenuation should be determined between different combinations of lines. That can be achieved by performing the above procedure multiple times where the line on which the signal is injected is different. These EUT measurements can all be performed in the same EUT file. The {{ScreenElement|Note}} of the test can then for example be used to specify which combination of lines is measured.


[[Category:RadiMation Application Note]]
[[Category:RadiMation Application Note]]
[[Category:RadiMation]]
[[Category:RadiMation]]

Latest revision as of 20:30, 20 February 2023

How to perform HV/LV Coupling measurements in RadiMation® according to CISPR 25[edit]

This RadiMation® application note explains how the high-voltage (HV) to low-voltage (LV) Coupling attenuation can be measured with RadiMation®. This HV-LV coupling attenuation is needed for several automotive standards, for example the CISPR 25:2016-10

HV-LV coupling attenuation[edit]

The HV-LV coupling attenuation measurement as it is described in Annex I.5.2 of the CISPR 25, is designated for components that are connected to the high voltage (above 60 V) system and the low voltage system of a motor vehicle, and has the purpose to determine the coupling between the two voltage systems through the component.

The principle of this measurement is that a component (the EUT) is connected on one side to the LV network and on the other side to the HV network. Then a defined disturbance signal is provided on the high voltage side, and an emission measurement is performed on the low voltage side of the EUT to determine how much of the injected signal is leaking to low voltage system.

Performing the voltage calibration according to CISPR 25[edit]

For the voltage calibration according to Annex I.5.2 of CISPR 25, the following devices and configuration are needed:

Devices:

  • HV/LV AN
  • EUT
  • Signal generator
  • Spectrum analyser

Cables corrections: (note: Cable corrections are optional)

  • Signal generator -> EUT
  • EUT -> pre-amp
  • pre-amp -> analyser

Configurations:

  • CI module
  • Voltage closed loop method -> using analyser as volt measuring device

Voltage closed loop measurement using a spectrum analyser[edit]

RadiMation® is able to measure the voltage during immunity tests by using a spectrum analyser. When selecting the testlevel/limit/input for the voltage, it is possible to select the measuring device. The selected Device can be changed to Spectrum Analyzer.

ConfigTestLevelVoltage.png

Exporting the voltage calibration file[edit]

To perform the required voltage calibration the Voltage closed loop method is used. This method is required to generate the same voltage level, while the power of the measurement locations is measured. This test can be configured using a Multiband Immunity test.

  • Create an EUT file that is used to store the calibration measurement results
  • Configure a Multiband Immunity test to generate a fixed voltage level over the required frequency range.
  • Start the configured test, and wait until the measurement is finished.
  • When the test is finished, the data of the measured voltage graphline can be exported to a Calibration file (CAL-File)
  • Click the Graphs button above the graph, and select the Export... option
  • Select the voltage graphline that should be exported to a Calibration file, then click the Next button
  • Select CAL-file as the type of the file to which the graphline should be exported, then click the Export button.
  • A Save Calibration as dialog will be shown to determine the location and name where the final calibration file should be stored.
  • The exported Calibration file is the result of the 'constant voltage method' for that measurement location. This calibration file can be used during substitution tests to generate a required voltage.

Performing the voltage emission test according to CISPR 25[edit]

For the voltage measurement according to Annex I.5.2.3 of CISPR 25, the following devices and configurations are needed:

Devices:

  • HV/LV AN
  • EUT
  • Signal generator
  • Spectrum analyser

Cables corrections: (note: cable corrections are optional)

  • Signal generator -> EUT
  • EUT -> pre-amp
  • Pre-amp -> analyser

Configurations:

  • CI module
  • Voltage calibration file
  • Test level voltage substitution -> using the voltage calibration file
  • Test level voltage measurement input -> using analyser as volt measuring device
  • Applicable limit lines

Regulating to the calibrated voltage[edit]

RadiMation® is able to regulate to the voltages determined during the performed voltage calibration.

ConfigureTestLevelVoltageSubstitution.png

Measure the voltage using a spectrum analyzer[edit]

RadiMation® is able to measure the voltage during immunity tests by using a spectrum analyser. When selecting the testlevel/limit/input for the voltage, it is possible to select the measuring device. This selection can be switched to Spectrum Analyzer.

ConfigureTestLevelVoltage.png

Performing the current emission test according to CISPR 25[edit]

For the current measurement according to Annex I.5.2.4 of CISPR 25, the following devices and configuration are needed:

Devices:

  • HV/LV AN
  • EUT
  • Signal generator
  • Spectrum Analyser -> Used as the sensor power meter in test-site
  • Current sensor(with correction file containing the transfer factor in Ohm)

Cables corrections: (note: Cable corrections are optional)

  • Signal generator -> EUT
  • EUT -> pre-amp
  • Pre-amp -> analyser

Configurations:

  • CI module
  • Voltage calibration file
  • Test level voltage substitution -> using the voltage calibration file
  • Test level input current sensor
  • Applicable limit lines

Regulating to the calibrated voltage[edit]

RadiMation® is able to regulate to the voltages determined during the performed voltage calibration.

ConfigureTestLevelVoltageSubstitution.png

Measure the current using a spectrum analyser[edit]

RadiMation® is able to measure the current during immunity tests by using a spectrum analyser as a sensor power meter in combination with a current sensor.

ConfigureTestLevelCurrent.png

Use a specific detector circuit during current measurements when using an analyser[edit]

When a spectrum analyser is used as the power meter, it is possible to configure the detector that should be used by the analyser.

This can be configured in the advanced options of the analyser used as power meter

ConfigureAnalyzerAsPowerMeter.png

Performing the radiated emission test according to CISPR 25[edit]

For the electrical field strength measurement according to Annex I.5.2.5 of CISPR 25, the following devices and configuration are needed:

Devices:

  • HV/LV AN
  • EUT
  • Signal generator
  • Spectrum analyser -> Used as the measuring device for the electrical field
  • Calibration antenna with antenna factor correction attached

Cables corrections: (note: Cable corrections are optional)

  • Signal generator -> EUT
  • EUT -> pre-amp
  • Pre-amp -> analyser

Configurations:

  • CI module
  • Voltage calibration file
  • Test level voltage substitution -> using the voltage calibration file
  • Test level electrical field input -> using spectrum analyser as field measuring device
  • Calibration antenna with correction file containing the antenna factor)
  • Applicable limit lines

Regulating to the calibrated voltage[edit]

RadiMation® is able to regulate to the voltages determined during the performed voltage calibration.

ConfigureTestLevelVoltageSubstitution.png

Measure the electrical field using a spectrum analyser[edit]

RadiMation® is able to measure the electrical field during immunity tests by using a spectrum analyser + antenna combination.

When selecting the testlevel/limit/input for electrical field, it shall now we possible to select the measuring device. This selection can be switched between Field Probe and Spectrum Analyser.

When selecting the Spectrum Analyser as measurement device, other controls will be shown at the bottom of the configuration screen. These controls make it possible to change the following settings which are used by the analyser to measure the electrical field.

  • RBW
  • Attenuation
  • Preamplifier
  • Measure Time
  • Detector (Peak, Average, Quasi-peak, RMS)

ConfigureTestLevelEField.png

When the spectrum analyser is used as the measuring device, an antenna must also be active in the test site. This antenna is used to attach the .COR file containing the antenna factor which is used to convert the measured voltage(V) returned from the analyser to a electrical field (V/m)

This method of measuring the electrical field uses the antenna factor which is attached to the calibration antenna found in the test-site, because during immunity testing another antenna can already be used to generate the field.

Information.png
Note: When the same antenna is configured for the antenna and calibration antenna slot found in the test-site, the antenna factor found in the .COR shall be merged with it self, when this happens the from voltage converted measured field shall be wrong. So make sure to create separate drivers for a normal antenna and calibration antenna, even if they in fact are the same antenna.

Configuring limit lines for HV/LV coupling measurements[edit]

Immunity limit lines[edit]

RadiMation® is now able to calculate peaks according to set limit lines in the immunity testing modules.

These peaks indicate the channel name of the input on which the measured value has exceeded the limit line for a certain frequency, as well as the related measurement setting applicable to the moment the peak has been measured.

Limit lines can be added to an immunity test by clicking the limit lines button on the right side of the TSF file. This will open a window in which limit lines can be configured for addition or removal.

Peaks are only calculated for testlevels defined as inputs in the TSF- file. All software automatically generated graphlines, as well as test levels, limits and other type of fixed value data are not taken in consideration for the peak calculation.

ConfigureLimitLines.png

Changing limit lines after test[edit]

Limit lines can also be changed after a test has finished. This can be done by selecting the limit line control on the right side of the view shown during/after testing.

When a limit line is changed all peaks are recalculated for the new limit line. This also implies that when all limit line are removed, all peaks shall be deleted.

Information.png
Note: Since limit lines can be changed after tests, it is also possible to add limit lines to already performed test which have been created in older RadiMation® releases.

ConfigureLimitLinesAfterTest.png

The peak table for immunity test modules[edit]

In the view shown while the test is running, it is possible to select the Peaks tab next to the Events and Note tabs. This Peaks tab will show all frequencies, related settings and the channel name of the inputs for which these frequency and settings are applicable.

The peak table is customisable in regards to which columns are shown.

ImmunityPeakTable.png

Conclusion[edit]

The RadiMation® multiband immunity test can be used to very accurately measure the leaking of the injected signal form the HV port to the LV port of components that are used in motor vehicles.

Some standards describe that the HV-LV coupling attenuation should be determined between different combinations of lines. That can be achieved by performing the above procedure multiple times where the line on which the signal is injected is different. These EUT measurements can all be performed in the same EUT file. The Note of the test can then for example be used to specify which combination of lines is measured.