Difference between revisions of "RadiMation Application Note 102"
(Created page with 'sdf') |
|||
Line 1: | Line 1: | ||
− | + | = Performing an ETSI EN300328 MIMO measurement = | |
+ | This application note explains how a MIMO measurement can be performed with {{RadiMation}} Free as it is described in the [[ETSI EN300328]]. | ||
+ | |||
+ | Create a new EUT-file by selecting “File” – “New” – “EUT” from the menu bar. Choose a filename and select “OK”. A new EUT-window will now be opened. | ||
+ | |||
+ | From the menu bar select “Test” – “Radiated Emission” – “Burst”. | ||
+ | |||
+ | |||
+ | |||
+ | Press “New” to create a new TSF-file (Test Setup). | ||
+ | |||
+ | A new window will now be opened in which the test can be configured. | ||
+ | * Press the '+ Add' button to add all the power meters to your test. | ||
+ | * Enter the correct parameters on the right hand side (frequency, trigger level, etc) | ||
+ | |||
+ | |||
+ | |||
+ | Press “Start Test” to start the conducted power measurement test with multiple power meters. | ||
+ | Enter a filename to save the test. | ||
+ | |||
+ | |||
+ | |||
+ | After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®. | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | [[Category:RadiMation Application Note]] | ||
+ | [[Category:RadiMation]] |
Revision as of 13:27, 2 December 2014
Performing an ETSI EN300328 MIMO measurement
This application note explains how a MIMO measurement can be performed with RadiMation® Free as it is described in the ETSI EN300328.
Create a new EUT-file by selecting “File” – “New” – “EUT” from the menu bar. Choose a filename and select “OK”. A new EUT-window will now be opened.
From the menu bar select “Test” – “Radiated Emission” – “Burst”.
Press “New” to create a new TSF-file (Test Setup). A new window will now be opened in which the test can be configured.
- Press the '+ Add' button to add all the power meters to your test.
- Enter the correct parameters on the right hand side (frequency, trigger level, etc)
Press “Start Test” to start the conducted power measurement test with multiple power meters. Enter a filename to save the test.
After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®.