Before actions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
The steps taken: | The steps taken: | ||
'''1.''' opening the Test Equipment window | '''1.''' opening the Test Equipment window, and press add. | ||
[[IMAGE:AddAction_BeforeActions.PNG]] | [[IMAGE:AddAction_BeforeActions.PNG]] | ||
'''2.''' | '''2.''' double click on the Messagebox, | ||
[[IMAGE:AddAction_1.PNG]] | [[IMAGE:AddAction_1.PNG]] | ||
'''3.''' Configuring the desired text in the message box | '''3.''' Configuring the desired text in the message box window | ||
[[IMAGE:AddAction_MessageBox.PNG]] | [[IMAGE:AddAction_MessageBox.PNG]] |
Revision as of 12:27, 24 May 2007
In the Test Equipment you can specify Before actions, these actions will be carried out before using the selected Test Equipment. The easiest way to explain is by using a example.
Example[edit]
In this example, RadiMation needs to be configured for people who do not do EMC measurements every day. To work around this, the manager has come up with the idea to create the text the same as the user looks at it. So instead of giving it the full name, he has chosen to describe the antenna.
The steps taken:
1. opening the Test Equipment window, and press add.
2. double click on the Messagebox,
3. Configuring the desired text in the message box window
This is all, the result will be: