Difference between revisions of "RadiMation Application Note 102"
Line 1: | Line 1: | ||
= Performing an ETSI EN300328 MIMO measurement = | = Performing an ETSI EN300328 MIMO measurement = | ||
− | This application note explains how a MIMO measurement can be performed with {{ | + | This application note explains how a MIMO measurement can be performed with {{RadiMationFree}} as it is described in the [[ETSI EN300328]]. |
− | Create a new EUT-file by selecting | + | Create a new EUT-file by selecting: |
+ | {{Menu|File|New|EUT}} from the menu bar. Choose a filename and select {{ScreenElement|OK}}. A new EUT-window will now be opened. | ||
− | From the menu bar select | + | From the menu bar select: |
+ | {{Menu|Tests|Radiated Emission|Burst}} | ||
− | + | Press {{ScreenElement|New}} to create a new TSF-file (Test Setup). | |
− | |||
− | Press | ||
A new window will now be opened in which the test can be configured. | A new window will now be opened in which the test can be configured. |
Revision as of 13:31, 2 December 2014
Performing an ETSI EN300328 MIMO measurement
This application note explains how a MIMO measurement can be performed with RadiMation® Free as it is described in the ETSI EN300328.
Create a new EUT-file by selecting:
From the menu bar select:
Press New to create a new TSF-file (Test Setup). A new window will now be opened in which the test can be configured.
- Press the '+ Add' button to add all the power meters to your test.
- Enter the correct parameters on the right hand side (frequency, trigger level, etc)
Press “Start Test” to start the conducted power measurement test with multiple power meters. Enter a filename to save the test.
After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®.