Release Notes/Solved items Version 5.1.3: Difference between revisions
Jump to navigation
Jump to search
(New page: == RadiMation version 5.1.3 == * #1889: Carrier level is not turned off in multiband immunity if an error occurs. * #1886: Continueing a test in automatic mode should continue on the corre...) |
No edit summary |
||
Line 5: | Line 5: | ||
* #1879: A message should be shown before a test-site is selected in Multiband immunity to allow for manual changes | * #1879: A message should be shown before a test-site is selected in Multiband immunity to allow for manual changes | ||
* #1878: Pulse Modulation needs to be added to the known modulation types in multiband immunity | * #1878: Pulse Modulation needs to be added to the known modulation types in multiband immunity | ||
* #1877: Voltage measurement using the Spectrum | * #1877: Voltage measurement using the Spectrum analyser/sensor powermeter/multimeter/oscilloscope is now possible in multiband immunity. The measured voltage can be shown in a graph, used as a limitation, or used to regulate the RF power. | ||
* #1876: All configured and activated AD-Channels in the EUT file, will be measured during the multiband tests. | * #1876: All configured and activated AD-Channels in the EUT file, will be measured during the multiband tests. | ||
* #1871: Carrier level is not set in the signal generator if it is loaded in the multiband immunity test | * #1871: Carrier level is not set in the signal generator if it is loaded in the multiband immunity test | ||
* #1866: Device initialization in multiband immunity should check all equipment before initializing equipment | * #1866: Device initialization in multiband immunity should check all equipment before initializing equipment |
Latest revision as of 09:01, 3 January 2020
RadiMation version 5.1.3[edit]
- #1889: Carrier level is not turned off in multiband immunity if an error occurs.
- #1886: Continueing a test in automatic mode should continue on the correct angle (position) instead of the modified angle
- #1880: AM Conservation in Multiband Immunity should be checked
- #1879: A message should be shown before a test-site is selected in Multiband immunity to allow for manual changes
- #1878: Pulse Modulation needs to be added to the known modulation types in multiband immunity
- #1877: Voltage measurement using the Spectrum analyser/sensor powermeter/multimeter/oscilloscope is now possible in multiband immunity. The measured voltage can be shown in a graph, used as a limitation, or used to regulate the RF power.
- #1876: All configured and activated AD-Channels in the EUT file, will be measured during the multiband tests.
- #1871: Carrier level is not set in the signal generator if it is loaded in the multiband immunity test
- #1866: Device initialization in multiband immunity should check all equipment before initializing equipment