The dwell time is applied after the leveling routine has finished.
Fixed dwell time
The fixed well time is a fixed time period.
External
The external dwell time can be used with an external EUT controller. RadiMation asks the EUT controller is the dwell time is finished. The EUT controller is determining if the dwell time has finished.