Before actions

From RadiWiki
Revision as of 09:53, 4 June 2007 by Joro (talk | contribs)
Jump to navigation Jump to search

In the Test Equipment you can specify Before actions, these actions will be carried out before using the selected Test Equipment. Before actions are very useful for:

  • Turning on a manual controlled amplifier
  • Changing antenna height or polarization manually
  • Connecting cables or making a specific measurement setup

The easiest way to explain is by demonstrating an example.

Example[edit]

In this example, RadiMation needs to be configured for people who do not do EMC measurements every day. To work around this, the manager has come up with the idea to create the text the same as the user looks at the hardware. So instead of giving it the full name, he has chosen to describe the antenna.

The steps taken:

1. opening the Test Equipment window, and press add.

AddAction BeforeActions.PNG


2. double click on the Messagebox,

AddAction 1.PNG


3. Configuring the desired text in the message box window

AddAction MessageBox.PNG


The result will be:

AddACtion PopUp.PNG


Note: Before and after actions are only available in multiband tests