RadiMation Conducted Emission Questions

From RadiWiki
Revision as of 11:15, 14 June 2007 by Netadmin (talk | contribs) (1 revision(s))
Jump to navigation Jump to search

Questions Conducted Emission:

  • Which EMC phenomen is tested/checked in CE tests?
  • Accoording to which standard is tested?
  • Where is the setup of the CE test described?
  • Is the setup different for CE/MIL-STD/Automotive?
  • What are the reporting requirements described in the standard?
  • Create a schematic with all the parts of the test-setup
  • Describe the reason/goal/responsibility of all parts of the test-setup
  • How is garanteed that RadiMation measures the correct emission of the device?
  • Which parts of the test equipment setup are uncertain. How does this influence the test result? How is this uncertainty solved?
  • Which information needs to be 'stored' to generate a report.
  • How long does it take to perform CE tests on an EUT?
  • How can the total testtime be improved?
  • Which devices can be used to measure the conducted emission of an EUT?