How to perform a MIL-STD-461 RS103, radiated susceptibility, electric field[edit]
This application note explains how the MIL-STD-461 RS103, radiated susceptibility, electric field test can be performed with RadiMation®
The exact requirements and test methods for the RS103 are specified in the MIL-STD-461.
Necessary equipment[edit]
The following devices are necessary to perform the CS109 test:
- Signal generator
- Amplifier
- Antenna
- Field probe
Define the test level[edit]
Create a correction file for the test level[edit]
- File
- New
- Correction
First create a correction file in RadiMation® and specify the test level (See 'Table XI RS103 limits.').
- File
- Save correction
Store the test level as correction file on disk.
This correction file with the test level will be used during EUT testing.
EUT Testing[edit]
EUT Testing equipment[edit]
The configuration of the eut test site should contain the following devices:
# |
Device name |
Tab in testsite configuration window |
note
|
|
Signal Generator |
Devices 1 |
The signal generator to use
|
|
Antenna |
Devices 1 |
The antenna to use
|
|
Amplifier |
Devices 1 |
The amplifier to use
|
|
Field Sensor 1 |
Field probes |
The field sensor to use
|
Configure the EUT test[edit]
To perform the test on the EUT, create a radiated immunity multiband test.
Create a test setup configuration file for the following frequency ranges:
Frequency range |
Frequency step |
Polarization
|
2 MHz to 30 MHz |
1% |
Vertical
|
30 MHz - 18 GHz |
0.5% |
Both (Horizontal and vertical)
|
18 GHz - 40 GHz |
0.25% |
Both (Horizontal and vertical)
|
The radiated immunity multiband test, can be configured by selecting from the menu:
- Tests
- Radiated Immunity
- Multiband
Start
|
The start frequency of the test. For example 2 MHz.
|
End
|
The stop frequency of the test. For example 30 MHz.
|
Frequency Step
|
The frequency step, see Table III.
|
Dwell Time
|
The dwell time.
|
Frequency Change Mode
|
Constant.
|
Modulation
|
The modulation to use see below.
|
Test equipment
|
The equipment needed for the radiated susceptibility test.
|
Location Type
|
Antenna height, distance, polarization and angle.
|
Test Level
|
Specify the Electrical field closed loop method test level. Also configured a "Variable field"
|
Inputs
|
No inputs are needed.
|
At TestLevel click Add to add a new Test level and select TestLevel - Electrical field closed loop method
Description
|
The description of the test level.
|
Test level
|
Variable field, and specify the correction file for the applicable test level. When the level is one value this value can be specified with Constant field
|
Tolerance
|
Specify the tolerance to use.
|
Probes
|
Check Probe 1 to measure with the first probe.
|
To configure the pulse modulation settings click Config next to the modulation settings, click the PM tab, and enter the pulse modulation settings as defined in 5.21.3.4.c.1.a
Activate modulation
|
Check this checkbox to enable the pulse modulation.
|
Frequency
|
The PM frequency 1 kHz.
|
Duty Cycle
|
A duty cycle of 50%.
|
Also apply modulation out of the dwell-time period
|
Check this checkbox to enable modulation outside the dwell-time.
|
When all settings are configured press Start Test to run the test.