Difference between revisions of "After actions"
Line 1: | Line 1: | ||
− | Configuring After actions is the same as [Before actions], the only difference is that the action is performed after the measurement is done with the equipment. | + | Configuring "After actions" is the same as [[Before actions]], the only difference is that the action is performed after the measurement is done with the equipment. |
Revision as of 12:34, 24 May 2007
Configuring "After actions" is the same as Before actions, the only difference is that the action is performed after the measurement is done with the equipment.