RadiMation Application Note 102
Performing an ETSI EN300328 MIMO measurement
This application note explains how a MIMO measurement can be performed with RadiMation® Free as it is described in the ETSI EN300328.
Create a new EUT-file by selecting:
From the menu bar select:
Press New to create a new TSF-file (Test Setup). A new window will now be opened in which the test can be configured.
- Press the + Add button to add all the power meters to your test.
- Enter the correct parameters on the right hand side:
- frequency
- trigger level
- etc
Press Start Test to start the measurement test with multiple power meters. Enter a filename to save the TSF-file, so it can be used again in the future.
After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time and RMS are calculated by RadiMation®.