Difference between revisions of "RadiMation Application Note 102"

From RadiWiki
Jump to: navigation, search
(Created page with 'sdf')
 
Line 1: Line 1:
sdf
+
= Performing an ETSI EN300328 MIMO measurement =
 +
This application note explains how a MIMO measurement can be performed with {{RadiMation}} Free as it is described in the [[ETSI EN300328]].
 +
 
 +
Create a new EUT-file by selecting “File” – “New” – “EUT” from the menu bar. Choose a filename and select “OK”. A new EUT-window will now be opened.
 +
 
 +
From the menu bar select “Test” – “Radiated Emission” – “Burst”.
 +
 
 +
 
 +
 
 +
Press “New” to create a new TSF-file (Test Setup).
 +
 +
A new window will now be opened in which the test can be configured.
 +
* Press the '+ Add' button to add all the power meters to your test.
 +
* Enter the correct parameters on the right hand side (frequency, trigger level, etc)
 +
 
 +
 +
 
 +
Press “Start Test” to start the conducted power measurement test with multiple power meters.
 +
Enter a filename to save the test.
 +
 
 +
 
 +
 +
After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®.
 +
 
 +
 +
 
 +
 
 +
 
 +
[[Category:RadiMation Application Note]]
 +
[[Category:RadiMation]]

Revision as of 13:27, 2 December 2014

Performing an ETSI EN300328 MIMO measurement

This application note explains how a MIMO measurement can be performed with RadiMation® Free as it is described in the ETSI EN300328.

Create a new EUT-file by selecting “File” – “New” – “EUT” from the menu bar. Choose a filename and select “OK”. A new EUT-window will now be opened.

From the menu bar select “Test” – “Radiated Emission” – “Burst”.


Press “New” to create a new TSF-file (Test Setup).   A new window will now be opened in which the test can be configured.

  • Press the '+ Add' button to add all the power meters to your test.
  • Enter the correct parameters on the right hand side (frequency, trigger level, etc)


Press “Start Test” to start the conducted power measurement test with multiple power meters. Enter a filename to save the test.


  After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®.