Difference between revisions of "RadiMation Application Note 102"

From RadiWiki
Jump to: navigation, search
Line 1: Line 1:
 
= Performing an ETSI EN300328 MIMO measurement =
 
= Performing an ETSI EN300328 MIMO measurement =
This application note explains how a MIMO measurement can be performed with {{RadiMation}} Free as it is described in the [[ETSI EN300328]].
+
This application note explains how a MIMO measurement can be performed with {{RadiMationFree}} as it is described in the [[ETSI EN300328]].
  
Create a new EUT-file by selecting “File” – “New” – “EUT” from the menu bar. Choose a filename and select “OK”. A new EUT-window will now be opened.
+
Create a new EUT-file by selecting:
 +
{{Menu|File|New|EUT}} from the menu bar. Choose a filename and select {{ScreenElement|OK}}. A new EUT-window will now be opened.
  
From the menu bar select “Test” – “Radiated Emission” – “Burst”.
+
From the menu bar select:
 +
{{Menu|Tests|Radiated Emission|Burst}}
  
 
+
Press {{ScreenElement|New}} to create a new TSF-file (Test Setup).  
 
 
Press “New” to create a new TSF-file (Test Setup).  
 
 
 
 
A new window will now be opened in which the test can be configured.
 
A new window will now be opened in which the test can be configured.

Revision as of 13:31, 2 December 2014

Performing an ETSI EN300328 MIMO measurement

This application note explains how a MIMO measurement can be performed with RadiMation® Free as it is described in the ETSI EN300328.

Create a new EUT-file by selecting:

   Menu.png File
      Menu.png New
         Menu.png EUT from the menu bar. Choose a filename and select OK. A new EUT-window will now be opened.

From the menu bar select:

   Menu.png Tests
      Menu.png Radiated Emission
         Menu.png Burst

Press New to create a new TSF-file (Test Setup).   A new window will now be opened in which the test can be configured.

  • Press the '+ Add' button to add all the power meters to your test.
  • Enter the correct parameters on the right hand side (frequency, trigger level, etc)


Press “Start Test” to start the conducted power measurement test with multiple power meters. Enter a filename to save the test.


  After a measurement has been performed, all parameter such as Max e.i.r.p, medium utilisation, Duty cycle, Min Gap time and Max. Sequence time are calculated by RadiMation®.