Difference between revisions of "RadiMation Application Note 154"
(→Necessary equipment) |
|||
Line 22: | Line 22: | ||
== Configuration of the test sites == | == Configuration of the test sites == | ||
+ | |||
+ | == Calibration procedure == | ||
+ | |||
+ | == Verification == | ||
+ | |||
+ | == EUT Testing == | ||
+ | |||
+ | == Conclusion == |
Revision as of 10:17, 16 October 2023
How to perform a MIL-STD CS114, Conducted susceptibility, bulk cable injection test
This application note explains how the MIL-STD CS114, Conducted susceptibility, bulk cable injection test can be performed with RadiMation®
The exact requirements and test methods for the CS114 are specified in the MIL-STD-461.
Necessary equipment
The following devices are necessary to execute this test:
- Signal generator
- Amplifier
- Coupler
- Forward power meter
- Reflected power meter (optionally)
- Current sensor
- Sensor power meter / Analyser
- 50 Ohm load
- 50 Ohm attenuator
- LISN
- Current injection device
- Current injection calibration jig (Calibration fixture)
- Cable drivers with corrections